NATURE PROTECTION MINISTRY TURNED DOWN TUKHMANUK MINING PROJECT
18:29 December 15, 2014
EcoLur
“Environmental Expertise” SNCO of Nature Protection Ministry issued
a negative opinion to the amended project of Tukhmanuk gold mining
project submitted by “Mego Gold” LLC.
It should be noted that on 30 June 2014 the Nature Protection
Ministry issued a positive opinion to the new tailing dump project
for Tukhmanuk gold dressing plant submitted by “Mego Gold” LLC,
which was once rejected by the Ministry still in 2013.
Disclaimer: This article was contributed and translated into English by Badalian Vardan. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.
Direct link to this article: https://www.armenianclub.com/2014/12/16/nature-protection-ministry-turned-down-tukhmanuk-mining-project/