Tatev Aerial Tram Grounded for Winter Outfitting
hetq
14:43, December 6, 2011
The Tatev aerial cable car will be out of commission from December
12th to the 19th.
A number of technical adjustments will be made before the cable car
can be operated in winter weather conditions.
Experts from Switzerland will also arrive to conduct a yearly
maintenance check of the equipment.
Disclaimer: This article was contributed and translated into English by Babajanian Karo. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.
Direct link to this article: https://www.armenianclub.com/2011/12/10/tatev-aerial-tram-grounded-for-winter-outfitting/