The Stepanaket Airport Intended To Be Exploited In October 2010

THE STEPANAKERT AIRPORT INTENDED TO BE EXPLOITED IN OCTOBER 2010

ARMENPRESS
May 25, 2009

STEPANAKERT, MAY 25, ARMENPRESS: The preparatory works of
reconstruction of the Stepanakert airport have kicked off.

Head of the "Horizon-95" construction organization which is the
contractor for construction of the airport and the passenger complex
Gagik Galstian told Armenpress that after a long pause the first
plane can land in Artsakh already in October 2010.

Parallel to this the "Horizon-95" concurrently starts the construction
of the Stepanakert laboratory of agricultural food and the building
of Nagorno Karabakh Chief Court in Shushi.

Disclaimer: This article was contributed and translated into English by Tigranian Ani. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.

Direct link to this article: https://www.armenianclub.com/2009/05/25/the-stepanaket-airport-intended-to-be-exploited-in-october-2010/