Yerevan Subway To Be Enlarged

YEREVAN SUBWAY TO BE ENLARGED

ARKA
April 7, 2008

YEREVAN, April 7. /ARKA/. Enlarging Yerevan subway is a priority of the
capital’s transport development plan for 2008, Yerevan Mayor Yervand
Zakharyan said. "Transport network is a small one in Yerevan. There
is no alternative to enlarging the subway network," the Mayor told
a Monday news briefing.

The Armenian Government allocated a subsidy of AMD 1.7bln for
additional preparation efforts. Zakharyan said the Mayor’s Office
is currently assessing the state of incompletely constructed subway
stations to set a corresponding action plan. They are negotiating
with the World Bank now to get a loan for the construction of new
subway stations.

As Zakharyan had earlier said they expected to get $60mln from the
World Bank.

Yerevan subway was founded in 1981. With ten stations operating
currently its total length is 13.4 kilometres. ($1 – AMD
308.31).

Disclaimer: This article was contributed and translated into English by Chakhmakhchian Vatche. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.

Direct link to this article: https://www.armenianclub.com/2008/04/08/yerevan-subway-to-be-enlarged/