Restoration of rail route to Azerbaijan "will cost Armenia $226M"

PanArmenian, Armenia
Dec 28 2021

PanARMENIAN.Net – The restoration of the Yeraskh – Julfa (Jugha) – Ordubad – Meghri – Horadiz railway on the territory of Armenia will cost about $226 million, Sputnik Armenia cited the Ministry of Territorial Administration and Infrastructures as saying on Tuesday, December 28.

According to preliminary data, construction of the rail route with a length of about 45 kilometers in Meghri will cost some $221 million. A further $5 million will be required to restore the rail section near Yeraskh (about 1 kilometer).

At the same time, the ministry added that a feasibility study is necessary is necessary to determine the exact price of the new infrastructure.

Prime Minister Nikol Pashinyan said in mid-December that at a meeting with Azerbaijani President Ilham Aliyev in Brussels the sides have reaffirmed their agreement to build a rail route from Armenia to Azerbaijan through Nakhijevan.

Disclaimer: This article was contributed and translated into English by Jalatian Sonya. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.

Direct link to this article: https://www.armenianclub.com/2022/01/01/restoration-of-rail-route-to-azerbaijan-will-cost-armenia-226m/