UPPER LARS CHECK-POINT TO OPEN IN TWO WEEKS
PanARMENIAN.Net
18.09.2006 14:17 GMT+04:00
/PanARMENIAN.Net/ Repair works at Upper Lars check-point will finish in
two weeks, Armenian Ambassador to Russia Armen Smbatyan reported. In
his words, Russian representatives convinced him that Repair works at
the check-point will finish in two weeks. The Russian party closed the
check-point, which is the only legal point at the Georgian-Russian
border, on July 8, naming the need for repair works there as the
cause for closing.
Disclaimer: This article was contributed and translated into English by Jagharian Tania. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.
Direct link to this article: https://www.armenianclub.com/2006/09/18/upper-lars-check-point-to-open-in-two-weeks/