Talks on Iran-Armenia gas pipeline reaching final stage

Talks on Iran-Armenia gas pipeline reaching final stage, says minister
Voice of the Islamic Republic of Iran, Tehran
31 Mar 04
The energy minister of Armenia Armen Movsisyan has said: Negotiations
are nearing the end on the construction of an Iran-Armenia gas
pipeline.
Movsisyan, referring to the two countries’ agreement on the
significant technical specifications of this project, added: It is
predicted that an agreement on the construction of this gas pipeline
would be completed during early days of the next Christian month April
, when Iran’s oil minister Bizhan Namdar-Zanganeh visits Armenia.
On the basis of this agreement, the gas pipeline carrying Iran’s gas
to Armenia will be completed in 20 months.

Disclaimer: This article was contributed and translated into English by Avanesian Avag. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.

Direct link to this article: https://www.armenianclub.com/2004/04/01/talks-on-iran-armenia-gas-pipeline-reaching-final-stage/