Armenian Nuclear Power Plant re-connected to grid after major repair

Save

Share

 12:20,

YEREVAN, OCTOBER 18, ARMENPRESS. After a 141-day planned preventive repair the Armenian Nuclear Power Plant has been re-launched and re-connected to the power grid.

Over 600 specialists from Armenia, Russia, Belarus, Ukraine, Croatia, Czech Republic, Slovakia and elsewhere took part in the repair work, the NPP operator said.

The repair will contribute to extending the lifecycle of the 2nd power unit, as well as the increase of the safety level.

The crew also conducted the planned annual repair works.



Disclaimer: This article was contributed and translated into English by Emil Lazarian. While we strive for quality, the views and accuracy of the content remain the responsibility of the contributor. Please verify all facts independently before reposting or citing.

Direct link to this article: https://www.armenianclub.com/2021/10/19/armenian-nuclear-power-plant-re-connected-to-grid-after-major-repair/

Emil Lazarian

“I should like to see any power of the world destroy this race, this small tribe of unimportant people, whose wars have all been fought and lost, whose structures have crumbled, literature is unread, music is unheard, and prayers are no more answered. Go ahead, destroy Armenia . See if you can do it. Send them into the desert without bread or water. Burn their homes and churches. Then see if they will not laugh, sing and pray again. For when two of them meet anywhere in the world, see if they will not create a New Armenia.” - WS